Used Rails
Specifications
The Rails used Steel Scrap ISRI R-50 & R-60 (51.67 Kg/M-GOST-7173-75), R-65 (64.72 Kg/M- GOST-8165-75). 12 Meter Lengths-Standard section "T" Rails original weight 50Lbs per yard or heavier; material will be cut up to 1.5 meters lengths, free from mud, dust, fluff, non-ferrous inclusions,excessive rust & other impurities, free from war & explosives, shells, cartridges,other arms & ammunitions used or otherwise, or closed containers, any harmful chemicals, substances & coatings.Any organic waste & other harmful substances, rust, fluff & other impurities not allowed over 1%.
Used Rails: R-50 GOST-7173-75 and R-65 GOST-8165-75. The scrap consists of R-50 (51, 67 kg/m) R-65 (64, 72 kg/m)
Used Rail ISRI 27-29: C: 0.54-0.82, SI: 0.18-0.40, Mn: 0.60-1.05, S: 0.04 Max, P: 0.035 MAX, AS: 0.01 Max of Mass Share
Norms: R-50 GOST-7173-75 & R-65 GOST-8165-75, Scrap R-50, 51.67 Kg-M, Scrap R-65, 64.72 Kg-M
ISRI (27) Rail, Steel No. 1
Standard section tee rails, original weight 50 pounds per yard or heavier, 10 feet long over.Suitable for re-rolling into bars shapes. Free from bent and twisted rails, frog, switches, guard rails,or rails with split heads and broken flanges. Continuous welded rail may be included provided no weld is over 9 inches from the end of the piece of rail.
ISRI (28A) Rail, Steel No. 2
Cropped Rail Ends, Standard section
original weight of 50 pounds per yard & over,18 inch long and under.
ISRI (28B) Rail, Steel No. 2
Cropped Rail Ends,Standard section
original weight of 50 pounds per yard and over, 2 feet long and under.
ISRI (28C) Rail, Steel No. 2
Cropped Rail Ends, Standard section
original weight 50 pounds per yard and over, 3 feet long and under.
ISRI (29) Rail, Steel No. 3
Standard section tee, girder, and/or guard rails, to be free from frog and switch rails not cut apart, and contain no manganese,
cast, welds, or attachments of any kind except angle bars. Free from concrete, dirt, foreign material of any kind.
Allocations and monthly volume of Used Rails is available through various collectors, send your request of requirements outlining full details and we will work a tactical plan with timeline for your consideration.
|
|